Civil

Oshen Apartments – Yeppoon

Address: 39 Hill Street, 30 & 32 Adelaide Street, Yeppoon (Fitzroy)
Client: Adelaide Hills Yeppoon Pty Ltd
Completion: 2013
Value: $18,000,000.00
Work Category: New Facility
Services Activity: Civil Engineering
Commission Type: Design, Documentation & Construction Services

DESCRIPTION OF CIVIL SYSTEM

Throughout the design and construction phases of this project, BG Civil has worked closely with our Client and Contractor, Hutchinson Builders to ensure the successful completion of all the civil related aspects of the development.
BG Civil was responsible for the preparation and council submission of the civil operational works drawings and reports, including:

  • Site Works Package,
  • Erosion & Sediment Control Program,
  • Access to Parking,
  • Build Over Sewer,
  • Traffic Management Report,
  • Roadworks,
  • Sewer Reticulation Plans,

Stormwater , Roof & Allotment Drainage including Site Based Stormwater Management Reporting, addressing quality & quantity issues.

DESCRIPTION OF PROJECT

Oshen Apartments is a 7 story medium rise, residential development, including 2 basement levels.

SIGNIFICANT ASPECTS

Significant excavation near the site boundary was required due to various site constraints and architectural requirements. BG Civil completed the detailed design and documentation for these excavation works.

Rainwater detention systems were designed by BG Civil, ensuring that there were no adverse impacts on the adjoining properties caused by the new development.